John N Dunn (mygreenpower) were employed as principle contractors to install 12 x 7Kw Electric Vehicle Charging Points in the carpark adjacent to the Business innovation centre.
The installation compromised of all distribution equipment including separate CT metered EVCP distribution board, which supplied the 6 dual Pod-Point pedestals, all the ground works including trenches, ducting, EVCP bases and making good was carried out by specialist civil engineering partner ensuring a safe, efficient and excellent end result.
The onboarding process was then commenced ensuring the end clients needs where met regarding the costings and specific operation of the EVCP system,