
Client: Lower Steenberg’s Yard
We worked with Pod-Point to deliver 9 x 7wk EVCPs across the resident’s car park at Lower Steenberg’s Yard, in Newcastle
The installation varied from wall mounted to pedestal mounted which required various installation methods, delivering a more commercial look which complimented the surrounding area. On this occasion we liaised with the buildings principal contractor who carried out all of the necessary ground works for this high specification contract.
Related Projects
Read more case studies

My Green Power completed a solar PV and battery storage installation at a petrol station in Boldon.
View Case Study

My Green Power improved the sustainability of Red Rose School and reduced their yearly running costs.
View Case Study

My Green Power helped reduce their energy consumption and maintenance costs with brighter, more energy-efficient LED lighting.
View Case Study